Pen y Cymoedd Windfarm Substation
This dataset shows Pen y Cymoedd Windfarm Substation Location. The location of the on-site substation. This is where transformers change the 33kV input from the wind turbines to a 132kV rating for use in the National Grid. This the final true data received from the developer (Vattenfall) signifying the end of the construction phase.
- Identification
- Extent
- Distribution
- Quality
- Keywords
- Spatial Reference System
- Content
- Constraints
- Maintenance
- Metadata
Identification
- Identifier
- NRW_DS124655
- Metadata Language
- English
- Lineage
-
GIS data provided to NRW for the PyC Windfarm project was acquired from various different sources/contractors as discussed below, but essentially is all derived from GPS surveys undertaken at various stages of the construction process: 1. Site Civils (turbine locations, track edge, crane hard-standings, culverts, coupe crossing points and all general civils detail etc. etc.): acquired by the Principal Contractor, JBBB, as part of the final 'As-built' survey undertaken post construction. A dual-frequency survey grade GPS was used, and the data was processed, and final drawings issued by Grontmij on behalf of the Principal Contractor in or around July 2018. Drawings were issued as AutoCAD dwg and converted to ArcGIS shape files to OSGB36 coordinate system/projection. 2. On-site cable arrays (33kV cabling): this was installed by subcontractor PSUK and the locations were surveyed at installation using a survey grade GPS, although there was some question about the accuracy of some sections (which may have been surveyed with a lower accuracy hand-held GPS). 3. The Grid Connection Route and Sub-Station Infrastructure: surveyed by grid connection Contractor ABB using survey grade GPS, although some discrepancies were identified when compared to civils as-built drawings. Whilst all surveys are theoretically accurate to about 0.5m (when related to OSGB/OSTN2) some uncertainties were identified: given the size of the site, the complex terrain, and the degradation of GPS in dense forestry, an overall accuracy of +/- 2m should be assumed.
- Dataset Reference Date (Publication)
- 2019-12-29
Temporal Extent
- Begin date
- 2017-01-01
- End date
- 2017-12-31
- Topic category
-
- Utilities communication
Extent
Extent
- Geographic Extent
- RHONDDA CYNON TAF - RHONDDA CYNON TAFF
- Geographic Extent
- CASTELL-NEDD PORT TALBOT - NEATH PORT TALBOT
Distribution
- Format Type and Description
-
-
Geographic Information System
Geographic Information System
()
- Specification
-
ESRI Feature Class
-
Geographic Information System
Geographic Information System
()
Quality
Data quality
- Quality Scope
- Dataset
- Lineage
-
GIS data provided to NRW for the PyC Windfarm project was acquired from various different sources/contractors as discussed below, but essentially is all derived from GPS surveys undertaken at various stages of the construction process: 1. Site Civils (turbine locations, track edge, crane hard-standings, culverts, coupe crossing points and all general civils detail etc. etc.): acquired by the Principal Contractor, JBBB, as part of the final 'As-built' survey undertaken post construction. A dual-frequency survey grade GPS was used, and the data was processed, and final drawings issued by Grontmij on behalf of the Principal Contractor in or around July 2018. Drawings were issued as AutoCAD dwg and converted to ArcGIS shape files to OSGB36 coordinate system/projection. 2. On-site cable arrays (33kV cabling): this was installed by subcontractor PSUK and the locations were surveyed at installation using a survey grade GPS, although there was some question about the accuracy of some sections (which may have been surveyed with a lower accuracy hand-held GPS). 3. The Grid Connection Route and Sub-Station Infrastructure: surveyed by grid connection Contractor ABB using survey grade GPS, although some discrepancies were identified when compared to civils as-built drawings. Whilst all surveys are theoretically accurate to about 0.5m (when related to OSGB/OSTN2) some uncertainties were identified: given the size of the site, the complex terrain, and the degradation of GPS in dense forestry, an overall accuracy of +/- 2m should be assumed.
Keywords
Keywords
- Type
- Theme
Citation
- Date (Publication)
- 2008-06-01
Keywords
Keywords
Spatial Reference System
Content
Content Information
NRW Profile
Custom Elements
- NRW Related Title
-
Pen y Cymoedd Windfarm Spur Roads
- NRW Related Title
-
Pen y Cymoedd Windfarm Low Voltage Cables
- NRW Related Title
-
Pen y Cymoedd Windfarm Demised Areas
- NRW Related Title
-
Pen y Cymoedd Windfarm Access Roads
- NRW Related Title
-
Pen y Cymoedd Windfarm Export Cable
- NRW Related Title
-
Pen y Cymoedd Windfarm 33 kV Cables
- NRW Related Title
-
Pen y Cymoedd Windfarm Turbines
- NRW Related Title
-
Pen y Cymoedd Windfarm Permanent Masts
- NRW Related Title
-
Pen y Cymoedd Windfarm Main Access
- NRW Related Title
-
Pen y Cymoedd Windfarm Site Boundary
Constraints
Constraints
Limitations on Public Access and Use
- Restriction type
- Other restrictions
Access Constraints Directive
- Limitations
- no limitations
Access Constraints Text
- Other constraints
-
There are no access restrictions on this data. NRW may release, publish or disseminate it freely.
Use Constraints
- Use constraints type
- Other restrictions
- Other constraints
-
© CNC/NRW Data may be re-used under the terms of the Open Government Licence providing it is done so, acknowledging both the source and NRW's copyright. It is the recipient's responsibility to ensure the data is fit for the intended purpose. Attribution statement: Contains Natural Resources Wales information © Natural Resources Wales and Database Right. All rights Reserved.
Metadata
Metadata
- File Identifier
- 4f4c4942-4343-5764-6473-313234363535 XML
- Metadata Language
- English
- Resource type
- Dataset
- Metadata Date
- 2024-05-30T15:32:23.113Z
- Metadata Standard Name
- NRW
- Metadata Standard Version
-
1.0